Andhra Pradesh CM N. Chandrababu Naidu has officially launched the second phase of the Seed Access Road and two major steel bridges at Undavalli. This massive ₹1,519-crore project aims to revolutionize connectivity between Amaravati, Vijayawada, and Mangalagiri.

Key Takeaways

  • Inauguration of the ₹1,519-crore Seed Access Road (Phase 2).
  • Two new steel bridges (110m and 280m) to link Vijayawada and Mangalagiri.
  • Future expansion to connect the capital region to NH-16.
  • Vision to establish Amaravati as a global 'Deep-Tech' capital with AI hubs.

In a landmark move for the development of Andhra Pradesh's capital, Chief Minister N. Chandrababu Naidu inaugurated the second phase of the Seed Access Road (E-3) and two significant steel bridges at Undavalli on Thursday. Describing the event as a cornerstone in the city's construction, the CM emphasized that the vision for Amaravati is rapidly turning into a reality.

Enhanced Connectivity for the Capital

The newly opened road stretches from Rayapudi through Venkatapalem, Penumaka, and Undavalli. The infrastructure includes two massive steel bridges: a 110-metre span crossing the Buckingham Canal and a 280-metre span over the Kondaveeti Vagu and Guntur Channel. These bridges are set to provide direct, seamless road links between Vijayawada, Mangalagiri, and the Amaravati capital region.

Why This Matters

BozokMedia analysis shows that this project is not merely about roads and bridges; it is about creating a high-tech ecosystem. By integrating underground utility corridors for electricity, gas, and water, the administration is building a future-ready urban center. The strategic connectivity provided by these bridges will significantly reduce transit times for commuters and boost commercial activity in the region.

"Amaravati will be developed as a pollution-free deep-tech capital, housing AI and quantum-computing hubs to rank among India's top five cities." — CM Chandrababu Naidu

During his address, the Chief Minister also paid tribute to the farmers who contributed approximately 34,000 acres for the capital's land pooling scheme. He addressed previous delays caused by the former government, noting that current efforts are focused on restarting and accelerating construction through retendering and new contracts.

Project Infrastructure Overview

ComponentDetails
Total Estimated Cost₹1,519 Crore
Bridge 1 Length110 Metres (Buckingham Canal)
Bridge 2 Length280 Metres (Kondaveeti Vagu)
Connectivity GoalDirect link to Vijayawada & Mangalagiri
Did You Know?: The Amaravati master plan received international support from Singapore, and the iconic government buildings are designed by the world-renowned London-based firm, Norman Foster.

Frequently Asked Questions

1. What is the next phase of the Seed Access Road?
The third phase aims to link the capital region directly to National Highway 16 (NH-16) near Manipal.

2. When is the official inauguration of Amaravati expected?
CM Naidu expressed his vision that Prime Minister Narendra Modi could inaugurate the capital in 2028.