Poor restoration of roads excavated for pipeline works is forcing motorists and schoolchildren to navigate treacherous surfaces across Tambaram.

  • Excavated road sections for water and drainage works have been poorly restored with uneven concrete.
  • Two-wheeler riders and cyclists are facing increased risks of accidents and vehicle damage.
  • Authorities cite bitumen shortages as a reason for using temporary concrete patches.

Tambaram, Chennai: Residents and commuters in the Tambaram City Corporation are facing a growing safety hazard. Roads that were recently excavated for essential water supply and underground drainage (UGD) works have been restored so poorly that they have become stumbling blocks for motorists. Instead of smooth surfaces, commuters are now navigating a patchwork of uneven concrete that poses a constant threat to stability and safety.

Critical Trouble Spots Identified

A detailed survey of the stretch from Pallavaram to Tambaram reveals several high-risk zones. Near the Pallavaram railway station, the approach to the flyover on Sivasankaran Street is riddled with damaged portions. Motorists are frequently forced to move toward the edges of the carriageway to avoid these bumps, creating a dangerous environment for autorickshaws and service road traffic.

The Railway Border Road, a vital artery for those heading toward the Metro station or avoiding GST Road congestion, is another major concern. Although restored with concrete six months ago following pipe-laying work, the surface remains significantly uneven, causing two-wheeler riders to swerve dangerously.

Why This Matters

BozokMedia analysis shows that the disconnect between utility departments (water/drainage) and road maintenance authorities leads to a cycle of 'temporary fixes' that compromise long-term urban mobility. When infrastructure projects are completed without ensuring surface leveling, the resulting 'patchwork' becomes a permanent hazard that increases vehicular wear and tear and accident rates.

The lack of seamless road restoration converts essential utility upgrades into public safety liabilities.

In Chromepet, the situation is particularly distressing for the youth. At Ayyasamy School Street, uneven concrete patches have made cycling a nightmare for students. One student reported multiple punctures in just two weeks. Similarly, on Chitlapakkam Main Road, street vendors have observed women and elderly cyclists losing their balance due to the jagged surfaces near Varadaraja Cinemas.

Did You Know?: Uneven road surfaces can increase the frequency of mechanical failures in vehicle suspension systems by up to 30%.

Frequently Asked Questions

Q1: Why aren't the roads being blacktopped properly?
A: According to the Corporation Commissioner, a shortage of bitumen is a primary factor, leading to the use of concrete as an immediate, albeit uneven, solution.

Q2: What is the official response from the authorities?
A: Commissioner S. Balachandran stated that concrete is used to ensure continuous traffic flow, and defects will be rectified upon formal complaint.

LocationPrimary IssueAffected Demographic
Pallavaram FlyoverUneven approach & damageAuto-rickshaws & Motorists
ChitlapakkamJagged concrete patchesWomen & Cyclists
ChromepetMultiple uneven pointsSchoolchildren