Due to macro drain construction works by the Highways Department, traffic at Sholinganallur Junction will be diverted for 15 days starting this Saturday.
Key Takeaways
- Temporary traffic diversion at Sholinganallur Junction due to drainage works.
- The diversion will last for 15 days starting Saturday.
- Includes MTC buses and all public vehicular traffic.
In a significant move to enhance urban infrastructure, the Highways Department has initiated construction works at the Sholinganallur Junction. The project involves the construction of a macro drain connecting the Sholinganallur Marsh to the Buckingham Canal, aimed at improving the city's water management system.
To facilitate these essential improvement works, a temporary traffic diversion has been implemented. This change will affect all public vehicular traffic, including Metropolitan Transport Corporation (MTC) buses, and is scheduled to remain in place for a period of 15 days starting this Saturday.
Mandatory Diversion Route
Commuters and motorists are advised to follow the designated detour: Proceed from Perumbakkam Semmozhi Salai towards HCL, then head to the ELCOT SEZ Junction. From there, take a left turn onto the ELCOT SEZ Internal Road, followed by a right turn towards TCS Junction to eventually rejoin the OMR Road.
Why This Matters
BozokMedia analysis shows that Sholinganallur is a critical artery for Chennai's IT corridor. While the macro drain construction is a vital step to prevent monsoon-related flooding in the OMR area, the 15-day diversion will likely increase travel time for thousands of daily commuters and IT professionals.
Upgrading drainage infrastructure is a long-term necessity for Chennai's resilience, despite the immediate logistical challenges it poses to urban mobility.
Frequently Asked Questions
1. How long will the traffic diversion last?
The diversion is expected to last for 15 days, starting from Saturday.
2. Will public transport be affected?
Yes, MTC buses and all other public vehicles will follow the diverted routes.