Commuters in South Delhi should prepare for significant delays as Metro Phase-IV construction on Mehrauli-Badarpur Road will restrict traffic for the next month.
Key Takeaways
- Metro Phase-IV construction is causing partial road closures on MB Road.
- Traffic restrictions are effective from August 15 to September 14, 2026.
- One carriageway from Khanpur towards Saket Metro is closed.
- Commuters are advised to use alternative routes to avoid delays.
Delhi commuters are facing a major logistical hurdle. Due to the ongoing expansion of Delhi Metro Phase-IV, the Mehrauli-Badarpur (MB) Road is expected to witness severe traffic congestion for approximately one month. The Delhi Metro Rail Corporation (DMRC) is currently executing critical construction work on the corridor connecting Tughlakabad and Aerocity.
Construction Details and Impact
The disruption is specifically centered around the construction of a portal beam between Pillar Nos. 40 and 37 near Sainik Farm Gate No. 2. To facilitate this, the Delhi Traffic Police has announced the closure of one carriageway of MB Road from Khanpur towards Saket Metro. Consequently, traffic moving in both directions will be squeezed into the remaining single carriageway, significantly reducing road capacity.
Why This Matters
BozokMedia analysis shows that the MB Road serves as a vital artery for South Delhi. The reduction in usable road space during peak morning and evening hours will likely lead to massive bottlenecks, impacting thousands of daily commuters and increasing travel time significantly.
Infrastructure development is a long-term gain that often necessitates short-term commuter inconvenience; however, proactive diversion planning is crucial.
Suggested Alternative Routes
To avoid being stuck in traffic, the authorities have suggested the following diversions:
| Starting Point | Suggested Route |
|---|---|
| From Lado Sarai | Lado Sarai T-Point → Anuvart Marg → T.B. Hospital → Press Enclave Road → Sheikh Sarai Red Light |
| From Khanpur | Khanpur T-Point → BRT Corridor → Sheikh Sarai T-Point → Aurobindo Marg |
| From Mandir Marg | Press Enclave Road → Sheikh Sarai Red Light → Khanpur Light |
Frequently Asked Questions
1. How long will the traffic restrictions last?
The restrictions are scheduled to remain in place from August 15 until September 14, 2026.
2. Should heavy vehicles use this route?
No, the Delhi Traffic Police strongly advises commercial and heavy vehicles to avoid the affected stretch and use designated alternative routes.